The 1.2 MW combined solar plus 250 kWh battery system at this Burlington County manufacturer demonstrates how solar + storage economics compound when a facility has the right load profile. Built in 2024, the project combines an 850 kW rooftop array with a 350 kW ground-mount on an adjacent vacant parcel, paired with a 250 kWh lithium-iron-phosphate battery for demand-charge offset.

How We Built This Project

How LandAir Approached This Project

  • We seize opportunities to innovate and grow

  • We are one firm with a shared sense of purpose

  • We care about each other and the world around us

The manufacturer has a compressor-cycling load profile — sharp peaks when compressors restart that drove ~$22/kW demand charges on the PSE&G GLP rate schedule. Solar alone would offset energy, but battery storage was needed to shave the peak demand. The combined system was sized against the specific bill profile, not generic vendor estimates.

The rooftop portion used ballasted attachment on a TPO single-ply roof. Ground-mount occupied an adjacent 2-acre vacant parcel using driven-pile foundations after geotechnical testing confirmed bearing capacity. The battery was installed in a purpose-built enclosure with NJ fire code (IFC) compliant ventilation and suppression. Parallel transformer tie-in eliminated any outage during AC connection — non-negotiable for the facility’s process power continuity.

The system has operated within 1.5% of PVsyst model since commissioning. Annual production averages 1,450,000 kWh — offsetting approximately 70% of the facility’s electricity consumption. The battery reduces peak demand by 180 kW, saving approximately $47,520 per year in PSE&G demand charges alone.

Results & Performance
1

Feasibility

Load profile analysis (12 months utility data), demand-charge modeling, structural pre-check, ground-mount geotech, fire code review. 3 weeks.
2

Engineering

Combined rooftop + ground-mount design, battery enclosure with fire suppression, parallel transformer tie-in for zero-outage. PE stamps. 6 weeks.
3

Permitting

Burlington County building, electrical, fire marshal review (battery), NJDEP review (no wetlands impact). 8 weeks parallel. 8 weeks.
4

Interconnection

PSE&G Level 2 commercial review with supplemental review for combined system, plus storage-specific interconnection requirements. 13 weeks.
5

Construction

Rooftop install, ground-mount foundation and erection, battery enclosure, parallel transformer install, electrical tie-in with zero outage. 14 weeks.
6

PTO + SuSI + NJESI

PSE&G witness test, Permission to Operate, NJBPU SuSI program registration, NJESI capacity-based incentive registration. 3 weeks.
What the Client Said

Project Information

Industry:
Light Manufacturing
Location:
Burlington County, NJ
Year Completed:
2024
System Size:
1.2 MW DC + 250 kWh battery
System Type:
Rooftop (850 kW) + Ground-mount (350 kW) + Storage
Utility:
PSE&G
Annual Production:
~1,450,000 kWh/year
Simple Payback:
4.8 years (with NJESI)
image6
LandAir Energy
Need Help? Call Us Now
+234 567 8113

Project at a Glance

1.2 MW
Combined System
1.45M kWh
Annual Production
70%
Usage Offset
180 kW
Peak Demand Reduction
4.8 yrs
Simple Payback
~38%
Net Cost After Stack
PSE&G
Utility Territory
NJESI
Storage Incentive Captured

Want a Project Like This?

Tell us about your facility. We respond within 2 business days. Or call us directly at 856-702-3721.
























    Reviewed by the LandAir Energy engineering team — NABCEP-Certified PV Installation Professionals.
    LandAir Energy · 2050 Fairfax Avenue, Cherry Hill, NJ · 856-702-3721
    Last updated: May 13, 2026