Builders of farm, construction and mining machinery carry heavy plate, robotic welding and paint cure loads, and a New Jersey solar array can cover a large share of them.
LandAir supports commercial solar planning, engineering and project coordination for New Jersey properties. The review starts with the building, its electric accounts and the owner's goals.
Review your actual bills, property constraints and design assumptions.
Review the property
Review electric use
Define the project
Solar for machinery manufacturers that build heavy equipment
Frames for tractors, loaders, excavators and mining attachments start as thick plate. Plasma and laser tables cut it, press brakes bend it, and robotic welding cells join it, all on electric service that stays busy through the weekday shifts. Downstream, a paint booth and cure oven add a large block of load, and bridge cranes lift every assembly between stations. Hydraulic test stands then run cylinders and pumps under pressure before a machine rolls out. Those loads sit squarely in daylight hours, which is when a rooftop array produces. Heavy equipment buildings are usually wide, tall bays with long-span roofs, and many have a gravel or paved staging yard beside them. Your demand charges and energy charges from PSE&G, JCP&L, Atlantic City Electric or Rockland Electric both fall as solar output covers more of the plant's midday draw.
Identify which process equipment uses electricity and which uses gas or other fuels. Solar PV offsets electricity; it does not directly replace fuel-fired process heat. Confirm the actual equipment and energy sources before projecting savings.
- Site-specific energy cost modeling
- Review of ownership and operating costs
- Project eligibility review
- Property and tenant planning
Planning solar around crane rails, paint booths and staging yards
Our engineers start with the roof framing, because crane runway columns and heavy trusses define where array weight can sit. Paint booth stacks and oven exhaust get clear setbacks so the roof stays serviceable. Potential New Jersey production incentives depend on the current program, project category, registration and eligibility. Confirm the applicable terms before modeling revenue. Wind and snow loads in North, Central and South Jersey set the racking design, and our team handles the township permit review. We coordinate energization and any required shutdowns with your plant electricians and operations team before construction.
Related: Machinery and Equipment Manufacturers and Commercial solar cost guide. See every business type we cover on our industries page.
- Electric bill review and usage pattern check
- Roof and site constraint review including access and safety
- Preliminary layout and sizing assumptions you can validate
- Early notes on permitting and interconnection requirements
- Clear next steps for design, pricing, and timelines
Review project economics and eligibility
Compare installed cost, financing, expected production, utility charges and ongoing operating obligations for the specific property. A production estimate is separate from a savings estimate; demand and fixed charges may remain.
Federal tax treatment and New Jersey production incentives have separate eligibility, ownership, registration and timing rules. Confirm the applicable requirements with the program administrator and your tax advisor before including benefits in a budget. See the New Jersey commercial solar incentives guide and cost and ROI guide.
Confirm each assumption before including it in a project budget.
Project cost
Review the complete scope, exclusions and financing terms.
Tax treatment
Eligibility and the benefit your organization can use require tax-advisor review.
Program eligibility
Confirm current program rules, registration and project requirements.
Production and usage
Model expected output separately from savings using the actual utility tariff.
Plan the project sequence
Share bill and site details
Develop the design and approvals plan
Agree construction and handover
What's Included for Farm, Construction and Mining Machinery Makers
Plasma, laser and press brake loads
Cutting tables and bending equipment draw strong current on every cycle through the shift. A rooftop array supplies much of that draw directly, and the site assessment reads your bills to show how your cutting floor shapes the numbers.
Robotic welding cells
Each welding cell uses a power source, positioner and fume extraction fan. These run for long stretches while frames are built, and they sit well inside the daylight window that the array serves.
Paint booth and cure oven
Booth supply fans and cure ovens carry some of the largest single loads in a heavy equipment plant. Our engineers coordinate array placement with the facility's exhaust stacks and with the local authority's requirements for paint areas.
Finished-machine carport
Combines, skid steers and mining attachments often wait in an outdoor lot. A solar carport canopy over that lot generates power while it shelters inventory, and it earns the canopy SuSI rate.
Hydraulic test stands
Cylinders, pumps and drive trains run on test benches before a machine is released. We account for these motor loads and their cooling pumps when sizing the system, so the array tracks real plant demand through the shift.
Parts and dealer support buildings
Many builders run a parts distribution building next to the plant. A second roof can host its own array under the same utility account structure, and we review whether one or two meters make sense.
Property considerations
Roof and structure
Operating patterns
Maintenance
Meters and ownership
Approvals and access
Critical operations
New Jersey project support
LandAir supports commercial solar project planning across New Jersey from Cherry Hill.
Discuss your commercial solar project
Share the property address, electric usage and the decision you need to make. Review feasible options and the next steps with LandAir.
Frequently asked questions
Can solar support the electric service of a plant with heavy welding?
Yes. The array ties into your main service through inverters, and welding equipment draws power as usual. Our engineers review service capacity and utility interconnection with your electrician so the plant keeps the supply it needs.
What if our roof has crane columns and exhaust stacks?
We design around them. The engineers review the structural drawings, set clearances around stacks and curbs, and place panels on the sections of roof that carry them best. A carport or ground mount can add capacity elsewhere on the property.
Does the tax credit apply to a machinery builder?
Federal tax benefits depend on the system owner, project timing and applicable requirements. Have your tax advisor confirm eligibility and the benefit your organization can use. Your accountant confirms state treatment.
What deadline matters for federal incentives?
Federal tax benefits depend on the system owner, project timing and applicable requirements. Have your tax advisor confirm eligibility and the benefit your organization can use. Starting with a site assessment gives your team the facts to plan that sequence with your accountant and your equipment suppliers.