The 425 kW rooftop solar system at this Burlington County distribution center represents what well-engineered commercial solar looks like in the South Jersey logistics corridor. Built in 2022 on a TPO single-ply roof with ballasted attachment, the system offsets approximately 62% of the facility’s annual electric consumption while preserving the building’s existing roof manufacturer warranty.

How We Built This Project

How LandAir Approached This Burlington County Project

  • We seize opportunities to innovate and grow

  • We are one firm with a shared sense of purpose

  • We care about each other and the world around us

This 425 kW rooftop project required careful balance between roof structural capacity, ballast weight loading, and tenant operational continuity. The facility operates two shifts with high dock activity throughout the day, so all construction sequencing was designed to avoid impact on loading and unloading operations beneath active install zones.

Engineering started with a structural pre-check using the building’s as-built drawings to confirm capacity for ballasted attachment — the existing 55 psf roof capacity comfortably accommodated the system’s 4.5 psf ballast load with a 12% structural margin. PSE&G interconnection application was submitted in parallel with detailed engineering, anticipating the supplemental review typically triggered for systems above 50 kW. Roof zones were sequenced so dock-side operations never had overhead activity during shifts.

The system commissioned in late 2022 has performed within 3% of the PVsyst-modeled production estimate over its first 18 months of operation. Annual production averages 510,000 kWh, offsetting approximately 62% of the facility’s electricity consumption. Net cost after federal ITC, MACRS depreciation, and first-year NJ Successor Solar Incentive credits landed at approximately 45% of gross system cost — yielding a simple payback of 5.2 years.

Results & Performance
1

Feasibility

Drone roof survey, structural pre-check using as-built drawings, 12-month load profile analysis, PSE&G hosting capacity confirmation. 2 weeks.
2

Engineering

PE-stamped single-line, racking layout, structural calculations, AHJ permit set, PSE&G interconnection application packet. 4 weeks.
3

Interconnection

PSE&G Level 2 commercial review with supplemental review for capacity. System impact study. Interconnection agreement countersigned. 11 weeks.
4

Permitting

Burlington County municipal building permit, electrical permit, structural verification by AHJ. Ran in parallel with utility review. 6 weeks.
5

Construction

Zone-by-zone install across 4 roof zones. Weekend AC tie-in. Daily cleanup. No operational disruption to facility shifts beneath. 8 weeks.
6

PTO + SuSI

PSE&G witness test, Permission to Operate, NJBPU Successor Solar Incentive program registration for 15-year production credits. 2 weeks.
What the Property Owner Said

Project Information

Industry:
Warehousing & Distribution
Location:
Burlington County, NJ
Year Completed:
2022
System Size:
425 kW DC
System Type:
Rooftop (TPO, ballasted)
Utility:
PSE&G
Annual Production:
~510,000 kWh/year
Simple Payback:
5.2 years
image6
LandAir Energy
Need Help? Call Us Now
+234 567 8113

Project at a Glance

425 kW
Rooftop System
510,000 kWh
Annual Production
62%
Facility Usage Offset
5.2 yrs
Simple Payback
~45%
Net Cost After Incentives
PSE&G
Utility Territory
2022
Year Commissioned
15 yrs
NJ SuSI Credit Term

Want a Project Like This?

Tell us about your facility — building type, square footage, utility, roof age. We respond within 2 business days. Or call us directly at 856-702-3721.
























    Reviewed by the LandAir Energy engineering team — NABCEP-Certified PV Installation Professionals.
    LandAir Energy · 2050 Fairfax Avenue, Cherry Hill, NJ · 856-702-3721
    Last updated: May 13, 2026