Burlington County Distribution Center — 425 kW Rooftop Solar
The 425 kW rooftop solar system at this Burlington County distribution center represents what well-engineered commercial solar looks like in the South Jersey logistics corridor. Built in 2022 on a TPO single-ply roof with ballasted attachment, the system offsets approximately 62% of the facility’s annual electric consumption while preserving the building’s existing roof manufacturer warranty.
How LandAir Approached This Burlington County Project
- We seize opportunities to innovate and grow
- We are one firm with a shared sense of purpose
- We care about each other and the world around us
This 425 kW rooftop project required careful balance between roof structural capacity, ballast weight loading, and tenant operational continuity. The facility operates two shifts with high dock activity throughout the day, so all construction sequencing was designed to avoid impact on loading and unloading operations beneath active install zones.
Engineering started with a structural pre-check using the building’s as-built drawings to confirm capacity for ballasted attachment — the existing 55 psf roof capacity comfortably accommodated the system’s 4.5 psf ballast load with a 12% structural margin. PSE&G interconnection application was submitted in parallel with detailed engineering, anticipating the supplemental review typically triggered for systems above 50 kW. Roof zones were sequenced so dock-side operations never had overhead activity during shifts.
The system commissioned in late 2022 has performed within 3% of the PVsyst-modeled production estimate over its first 18 months of operation. Annual production averages 510,000 kWh, offsetting approximately 62% of the facility’s electricity consumption. Net cost after federal ITC, MACRS depreciation, and first-year NJ Successor Solar Incentive credits landed at approximately 45% of gross system cost — yielding a simple payback of 5.2 years.
Feasibility
Engineering
Interconnection
Permitting
Construction
PTO + SuSI

Facility Operations Director
CEO, Traders Corp.Facility Operations Director
CEO, Traders Corp.Project Information
Warehousing & Distribution
Burlington County, NJ
2022
425 kW DC
Rooftop (TPO, ballasted)
PSE&G
~510,000 kWh/year
5.2 years

+234 567 8113
Project at a Glance
Want a Project Like This?
Tell us about your facility — building type, square footage, utility, roof age. We respond within 2 business days. Or call us directly at 856-702-3721.
LandAir Energy · 2050 Fairfax Avenue, Cherry Hill, NJ · 856-702-3721
Last updated: May 13, 2026